Corporate Presentation - November 2009
URL
EMBED
Page 0:
Page 1: TSX.V : SOH
A Canadian Publicly Traded Company
Developing gold, silver and base metals in Mexico’s prolific Sierra Madre mineral belt
1
Page 2: Legal Disclaimer
This presentation may contain forward looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements. Soho Resources Corp. relies upon litigation protection for forward-looking statements.
2
Page 3: Officers and Directors
Independent Directors
Ralph E. Shearing, P.Geo.
President, CEO, Director
Art Freeze,
Director
P.Geo
Don Crossley, CA
Chief Financial Officer
William Howald,
Director
B.Sc., CPG
Yao Sun,
B.Comm, CMA, CPA Director, VP Asia Pacific Region
Paul Chung,
Director
MBA, B.Sc. Geology
Lianxi Zhang, B.Sc. Chemical Engineering
Director
3
Page 4: Capitalization (at Nov 13, 2009)
Share Treasury (millions) Shares Issued 140.9 10.9 Share Price 52 Week High Market Capitalization $0.075 $0.14
Warrants Outstanding
Exercise Value $0.54 million
Options Outstanding
Exercise Value $0.77 million
7.8
52 Week Low Shares Issued (millions)
$0.01 140.9 $10.57
Fully Diluted
159.6
Market Capitalization (millions)
4
Page 5: Objective Capital Research Report Valuation Aug19, 2009 - $0.35
5
Page 6: “Substantial classification upgrade”
“Confirmed valuation more robust on gathering confidence” “Substantially larger NI 43-101 compliant mineral resource” “On track to achieve production within next five years” “Jocuixtita project now becomes an important second exploration play”
To read the complete report “click here”
6
Page 7: Tahuehueto Project
Advanced Au, Ag, Cu, Pb, Zn Project Robust 43-101 compliant mineral resource 9,081 hectares
Past small scale producer Ag, Au, Zn, Pb Project Never explored using modern techniques 4,332 hectares
Jocuixtita Project
7
Page 8: 8
Page 9: Tahuehueto Project
La Cienega
To Culiacan
(Operational end 2010)
9
Page 10: New highway construction to open deep sea ports to future Tahuehueto production
Canelas to Tamazula Under Construction Completion End of 2010
Current Tahuehueto Access Road
10
Page 11:
New highway construction to provide access to deep sea ports on west coast (completion end of 2010). New potential access route Tahuehueto – Topia approx 40 kms gravel road. Topia – Culiacan – Mazatlan approx 375 kms on paved government highway.
Opens world markets to sell Tahuehueto concentrate
Existing access mandated transporting concentrate to Penoles Torreon smelter, approximately 600 km with 185 km on gravel road.
11
Page 12: TAHUEHUETO PROPERTY FUTURE ROAD ACCESS
Future road to property Approximately 20 km
Existing road to be upgraded Approximately 25 km
Tahuehueto Claims Powerline Road to be upgraded New Road Option 1 New Road Option 2 New Road Option 3 New Highway
Existing Powerlines
TOPIA
12
Page 13: Associated Structures in Tahuehueto, 9081 Hectare Land Claims. Au, Ag, Cu, Pb,Zn
Pitallo Santiago
Espinal
Resource
Prospective - Unexplored
Tres De Mayo
13
Page 14: 7.4 Million Tonnes Measured & Indicated
El Creston – 53% 3.9 Million Tonnes 411,861 Gold Equivalent Oz.
El Rey - 0% No Measured or Indicated. Santiago – 1% 69,410 Tonnes 7,407 Gold Equivalent Oz.
Cinco de Mayo / El Catorce – 32% 2.4 Million Tonnes 152,326 Gold Equivalent Oz.
El Perdido – 14% 1.04 Million Tonnes 66,661 Gold Equivalent Oz.
AuEQ – Gold & Silver Only Base metals and Inferred will add additional value
14
Page 15: NI 43-101 Resource Highlights
Over 7 million tonnes measured & indicated (“M&I”)
Plus 4.8 million tonnes Inferred 499,000 oz Gold M&I
(Au only, additional inferred oz available)
Includes 60% of Resource in M&I Categories
638,960 oz AuEQ M&I
(Au & Ag only, additional inferred oz available)
1.213 million oz AuEQ in M&I
(All metals, not including Inferred)
Note: AuEQ Calculated using Kitco metal prices Oct 09, 2009)
15
Page 16: NI 43-101 Resource Increase 2008 - 2009
91% increase in total tonnage from 2008 to 2009
6,402,000 Tonnes
12,245,000 Tonnes
4,868,000
Inferred
4,123,000
6,402,000
Inferred Indicated
3,254,000
Measured
April 2008 May 2009
16
Page 17: 2009 Tahuehueto NI 43-101 Mineral Resource Estimate
Tahuehueto Resources
GOLD (Au) SILVER (Ag) COPPER (Cu) LEAD (Pb) ZINC (Zn)
Category
Measured Indicated
Tonnes (,000’s) 3,254 4,123
g/t
2.40 1.87
Oz. (000’s) 251 248
g/t
36.30 33.92
Oz. (000’s) 3,798 4,496
%
0.28 0.27
lbs. (000’s) 20,439 24,900
%
1.10 1.03
lbs. (000’s) 79,228 93,511
%
2.07 1.96
lbs. (000’s) 148,759 177,894
Total M&I
7,377
2.10
498
34.97
8,294
0.28
45,339
1.06 172,738 2.01 326,653
Inferred
4,868
1.06
31.77
0.23
1.23
2.26
NOTE: The cutoff grades used to determine the above mineral resources were 2 grams per tonne AuEQ for sulfide mineralization and 3 grams per tonne AuEQ for oxide mineralization
17
Page 18: 2009 NI 43-101 Cut-off Grade Details M&I Resource
Tahuehueto Measured & Indicated
Cut Off Tonnes Oz. Ag lbs. Cu lbs. Pb AuEQ/t (millions) g Au/t Oz. Au g Ag/t (millions) Cu% (millions) Pb% (millions) Zn% lbs. Zn (millions)
2
7.377
2.10
498,000 34.97
8.294
0.28
45.339
1.06
172.738
2.01
326.653
3
5.061
2.67
434,813
37.90
6.167
0.30
33.376
1.14
126.968
2.13
237.563
4
3.489
3.55
398,332
44.27
4.967
0.36
27.770
1.32
101.664
2.51
193.388
5
2.533
4.37
355,868
48.40
3.942
0.41
22.931
1.46
81.541
2.82
157.349
6
1.864
5.37
822,066
53.89
3.230
0.47
19.384
1.63
67.092
3.11
127.837
18
Page 19: Cut Off AuEQ/t
Tonnes
GOLD g/t
SILVER g/t
COPPER %
LEAD %
ZINC %
2
3 4
4,868,000
2,945,828 1,945,005
1.06
1.38 1.72
31.77
34.53 38.07
0.23
0.26 0.30
1.23
1.43 1.56
2.26
2.68 3.11
5
6
1,173,344
685,997
2.19
2.78
46.93
50.78
0.38
0.43
1.83
1.98
3.32
3.60
19
Page 20: Tahuehueto Project 9,081 hectares
Jocuixtita Project 4,332 hectares
20
Page 21: Jocuixtita Project 4,332 hectares
San Dimas (Tayoltita)
Current Producer Over 10 million oz. gold 1 billion oz silver
21
Page 22: 22
Page 23:
Located in Sinaloa State, about 120 km N.E. of Mazatlan Mineralized zones ranging from 4 to 10 metres wide
Road access easily upgraded to support potential mine
Close to all necessary infrastructure Near famous San Dimas Mining District Tayoltita Mine
Unexplored by modern exploration techniques
23
Page 24: 24
Page 25: Au g/t 0.02
Ag g/t 2.5
Pb % 0.01
Cu % 0.02
Zn % 0.02
25
Page 26: JOCUIXTITA PROJECT TAHUEHUETO PROJECT
Head Office
Suite 250 – 1090 West Georgia St. Vancouver, BC, V6E 3V7 Telephone: 604-684-8071 Toll Free: 1-800-685-0576 info@sohoresources.ca
Mexico Office
Blvd. De las Rosas No.50 Norte Francc. Jardines De Durango Durango, Dgo. Mexico C.P. 34200 Telephone: +52 (618) 129-5416 Fax: +52 (618) 143-4514
26
Page 27: